Production Capability

Neostar United has 4 factories and some cooperative production base all over China, this means we can arrange our production in lower cost and assure our delivery in time.

The factories and production bases all have ISO9001 and ISO14001 certificates. Some of the production bases also have GMP workshops, and have been audited by many international pharmaceutical companies.

  • Liaoning Shenyang
    Production Base

  • Guizhou Qiandongnan
    Production Base

  • Shandong Heze
    Production Base

  • Anhui Chizhou
    Production Base

  • Liaoning Shenyang
    Production Base

    Located in Xinmin Economic and Technological Development Zone, Shenyang City, Liaoning Province; The total area of the factory is 80,614 square meters, and the total construction area is 24,671 square meters. Dedicated to the development and production of oral solid preparations of traditional Chinese medicine, pharmaceutical APIs and intermediates. At present, there are 3,086.23 square meters of API production workshop, 8,110.44 square meters of comprehensive preparation workshop, 4,236.7 square meters of traditional Chinese medicine extraction workshop, 3,379.16 square meters of quality inspection, R&D and comprehensive office building, 3,009.6 square meters of comprehensive warehouse, sewage treatment station, heating station, fire fighting and other related supporting facilities. The scope of the company's external projects mainly includes the synthesis and development of preclinical experimental drugs and their intermediates, the production and process optimization of clinical phase I, II and III experimental drugs and their intermediates, and the production and process optimization of API drugs and their advanced intermediates.

  • Guizhou Qiandongnan
    Production Base

    Located in Qiandongnan, Guizhou, The company is mainly engaged in the production of pharmaceutical intermediates, pesticides TC and their intermediates, flavors and fragrances, as well as daily chemicals. It covers an area of 40,000 square meters with floor area of 25,000 square meters.

    At present, there are two clean workshops, two synthetic workshops, engineering power center, office area, all kinds of warehouses of A, B and C, sewage treatment center and so on. The total volume of the reactor is over 500 cubic meters. It has the ability of high and low temperature reaction, and the reaction temperature range is - 40℃ ~ 280℃.

  • Shandong Heze
    Production Base

    Company iocated in Fuchun economic development area, Juancheng County, Shandong province. It is close to Jidong highway and Linshang highway, and Jingjiu railway and Ridong expressway pass though this area, enjoying good location.

    It covers an area of 80,000 square meters with a building area of 30,000 square meters.

    Reactor size:3000L to 10000L

    Working temperature: -20°C~140°C

    Good at reaction: Etherification reaction;Etherification Reaction

  • Anhui Chizhou
    Production Base

    Company covers an area of 22932㎡; Has fixed assets of more than 50 million yuan; Registered capital: 10 million yuan. Currently, there are 45 employees. The company is located Dongzhi economic development zone. The company is engaged in the production of pharmaceutical intermediates, pesticide intermediates and other fine chemicals development, production and sales. It is a high-tech enterprise of Anhui Province, a demonstration enterprise of Anhui Province Industry-University-Research Alliance, Anhui Province recognized enterprise technology center, and a SRDI small and medium-sized enterprise of Anhui Province.

    At present, the company has complete production facilities: the production of Class A workshop of more than 1500 ㎡, divided into three fire protection zones; More than 300 ㎡ of analysis center, more than 90 ㎡ of explosion-proof central automation control room, with more than 3000 ㎡ of class A and B warehouse. In 2021, the construction of environmental protection facilities was improved: more than 3 million yuan has been invested in the construction of automatic activated carbon absorption and desorption tail gas device; More than 5 million yuan was invested in the construction of 50 tons/day sewage treatment center station.